Real Arizona homes, photographed after the install. Not renderings.

Double entry, full arch

Single entry, forged scroll

Double entry, clean lines

Mid-century home, full glass

Single entry, eyebrow arch

Double entry with sidelights

Double entry, modern grid

Double entry, arched scroll

Single entry under an arch window

Double entry, dark bronze

Single entry, matte black

Sliding wall onto the patio
Every one of these started the same way — four questions about the entrance, then a call about what was in stock for it.
It's who turns up, what they leave behind, and whether the wall gets put back together. Read what our customers write about — it's never the ironwork.
“From the sales process to the installation to the follow up drywalling and painting everything was great. Very professional and our new doors are beautiful. Everyone took great care to provide the best customer care and service.”
Terry Carlson
“Showed up on time for their appointments, did a great install. Prep and finish was outstanding. There are a lot of so-called service companies out there, this is a great one. And my front door looks fantastic — my neighbors are stopping by and asking me where I got it.”
Jim Lasky
“We were very pleased with our new door and it was well worth the wait. They helped us design our door. Installation was professional and courteous.”
Rama Kunkle
Notice what all three are about: the install, the finish, the clean-up, the showing up. That happens because nobody is subcontracted — the reframe, stucco, drywall and paint crews are all ours. It is also the reason we can put a Limited Lifetime Warranty behind the door and the frame.
The honest comparison, including the part about the Arizona sun.
| Timber door | Iron Doors Arizona | |
|---|---|---|
| Upkeep | Stain and seal every few years | Household soap on a cloth |
| In the sun | Dries out, moves, changes shape | Galvanized for marine-grade corrosion protection |
| Over 8 ft tall | Most come with no warranty at all | Limited Lifetime Warranty on the structure |
| Build | Varies by maker | 12-gauge steel, fully foam-insulated |
| Airflow | Open the door and let the bugs in | Operable glass with metal screens that don't cut |
And here is the useful part: a standard timber door sits in a standard opening. Standard openings are exactly what we keep on the floor — which is how a replacement lands at 30–60 days instead of six months.
Nothing here waits on a factory. If one of them fits your opening, it goes in next month.


















Eighteen of more than fifty. Keep scrolling — the rest are on the floor.
A new entrance doesn't have to come out of one month.
0% interest
for 12 months
Financing runs through Momnt. Pre-qualifying takes a few minutes and doesn't commit you to anything — a specialist walks you through it if you want it.
Subject to credit approval. Minimum loan amounts apply. Full terms are provided by the lender before anything is signed.
Worth knowing your number first — the four questions give you the range before anyone talks money.
Not a franchise, not a dealer network. The doors are built, sold and installed by the same company.
2301 W. Indian School Rd., 85015
Mon–Fri 8:30–4:30 · Sat 10–4 · by appointment
6741 N. Thornydale Rd. #131A, 85741
Mon–Fri 9:30–5:00
694 S Cooper Rd #A3, 85233
Mon–Fri 9:00–4:30
1512 Willow Creek Rd. Suite B, 86301
Mon–Fri 9:30–4:30
You see your timeline and range on the screen straight away. Then one specialist calls once, checks your answers against what is actually on the floor, and tells you which doors could go in soonest. If nothing standard fits, they say so. One call — you are not put on a list.
Yes. Every door is made to the exact dimensions of your opening — that's why the opening gets measured on site before anything is ordered.
No. They hang on heavy-duty barrel hinges built for the weight. Homeowners regularly tell us they swing easier than the timber door they replaced.
The door is in and locking the same day. If the opening needs stucco, texture, drywall, paint or tile work afterwards, that finishing can run up to two weeks — but your home is never left open overnight.
A Limited Lifetime Warranty on the structure of the door and frame, and two years on the finish.
Our own crews do the reframing, stucco, drywall and paint — no subcontractors. Cleaning up behind ourselves is part of the job, and it's the thing customers mention most often in their reviews.
Powder coat can't be repaired without pulling the door, stripping it and re-baking — and the baking would destroy the foam insulation inside. Ours are galvanized, dipped, primed and blasted, then given two coats of paint, bronze dusting and a clear coat. Damage can be touched up in place.
Iron Doors Arizona · ROC #319940 · in business since 2016
Phoenix · Gilbert · Tucson · Prescott
★ 4.9 across 596 Google reviews · BBB A+, accredited since 2020
Timelines shown reflect only the answers given on this page. The fit, the final
specification and the price are confirmed when the opening is measured.